
|
Kitchen Project Authentic Assessment Timeline and Requirements |
Mr. Gawlik Pre-Engineering 2 |
Timeline; Remember that one class period day is 50 minutes, one class period week is 4 hours and 10 minutes. If you miss a class period or did not start on the day we began the project you are expected to put in time before school, after school or at home.
|
One Week |
|
|
One Week |
|
|
One Week |
|
|
One Week |
|
|
One Week before the end of the this quarter |
|
|
Kitchen Project Requirements 1. Cover Page, Name, Period, Pre-Engineering 2, Kitchen Project, Hinsdale South High School, and Date. 2. Report Minimum two pages typewritten, 12 point font size, double spaced, does not include planning guide, cover page, shopping list or drawing. 3. Shopping List sheet Name, Period, Pre-Engineering 2, Kitchen Project, Hinsdale South High School, and Date. 4. Drawing Name, Period, Pre-Engineering 2, Kitchen Project, Hinsdale South High School, and Date. 5. Rough Draft Paper, hand written or type written or emailed to me must include Period, Pre-Engineering 2, Kitchen Project, Hinsdale South High School, and Date. 6. Additional Information gathered from Internet and Stores about prices and qualities of kitchen components; this is your research. 7. Self Assessment completed on rubric with name, scores and total. 8. These requirements may change, but consider them minimum requirements. |
||